Belt width | 1200 mm |
---|---|
Belt speed | 3.7m/s |
Conveying capacity | 1100tph |
Material sized | 55mm |
Material | coal |
Motor power | 5.5KW |
Working voltage | 380-400V,50/60HZ |
Time control | Controlled by time relay or PLC |
The equipment takes complete cross section of sample from moving conveyor belt; it mainly used for automatic sampling of sinter,pellet,ore powder.coal,coke and solid material conveying by belt.
Introduce:
It takes complete cross section of sample from moving conveyor belt; it consists of motor
,speed reducer ,rotating sample cutter,approaching switch, frame and casing and so on .
The equipment is manufactured in accordance with standard of GB/T475-2008 and
standard GB/T10355.1-2000.
Typical applications
Widely used in steel plants,power plants, coal mines and other industries for continuous
transportation of bulk materials, to achieve full-section automatic random sampling, eliminate
human interference. It can sample quickly, with simple structure and reliable operation.
Features
1.Belt width:400-2000mm
2.It cuts the complete cross-section of the stream at uniform speed,the samples are even;
3.The equipment is reliable and easy to be installed and operated;
4.It avoid the effect of the human factor to the material,which can make sure the sample is
accurate with high representativeness and scientificity;
5.Both manual and automatic operation is available,which reduces the labor intensity
and insures personnel safety.
Operating procedures
1).Before the trial run, check the bearing, whether the reducer is short of oil, if oil shortage
should be added in time.
2)Check the motor reducer, bearing block, steel bracket, support seat and the bolts it sees are tight.
3).After checking everything is normal, first send out the test signal, then start the motor.
4) When the sampling cutter is running, pay attention to observe whether the operation is normal,
whether the starting and stopping positions are suitable, whether there is angle deviation, if find
problems and stop the machine in time.
5) When the sampling cutter is working, it is strictly forbidden for the staff to put their heads into
the containment cover for inspection, cleaning and adjustment, so as to avoid danger.
Production process:
We will contact you within 1 working day, please pay attention to the email with the suffix “@york-ep.com”.